Strategy selection
Stair pressurization, atrium exhaust, or zoned control based on building geometry and code path.
Pressurization, exhaust, and zone control for high-rise, atrium, and assembly spaces — coordinated with architectural and MEP disciplines.
Stair pressurization, atrium exhaust, or zoned control based on building geometry and code path.
Fan capacity, shaft routing, and controls integrated with fire alarm and BMS.
Performance verification and documentation for authority acceptance.